60,000 t Cement Silo Terminal — Point of Calhoun — 3D Model
AMERICAN GULF — Cement Import Terminal
60,000 t storage · Point of Calhoun · per Slipform Engineering dwgs T9263-400-001…004.
Siwertell ST 940 D from the as-built conversion model; dock shown with representative dimensions.
Unloader:
Unloader motions · ranges per the Siwertell function spec
Solid labels = dimensioned on Slipform drawings.
Dashed labels = representative / to verify (dock, layout offsets).
Unloader buttons: the as-built coal machine, the cement conversion, or the changes between them.
Motions: slew ±110°, luff +35/−18°, pendulum ±30° (Siwertell function spec); heights to dwg 7007545.
All values live in the DIMS object in this file.